The sea wall
Fix the sea wall before the next storm season.
Why
The Saltgate wall has moved 140 mm since the storm of 2017. Every winter the city patches it and hopes. A wall is either rebuilt on a plan or rebuilt after a flood, and the second costs four times as much.
What we will do
- Survey the North Mole and the Saltgate frontage in the first ninety days, and publish the survey.
- Rebuild the failed 640 m at Saltgate first, over two summer seasons.
- Raise the coping along the Quayside walk and gate the four slipways.
- Seed a maintenance fund so the next mayor is not starting again.
The costed lines
| Line | When | Cost |
|---|---|---|
| Survey and repair design, North Mole and Saltgate | Year 1 | $2.4m |
| Rebuild 640 m of failed wall, Saltgate | Years 1 to 2 | $18.6m |
| Raise the coping 0.6 m along the Quayside walk | Years 2 to 3 | $9.8m |
| Flood gates for the four slipways | Year 3 | $6.1m |
| Twenty-year maintenance fund, seeded | Year 4 | $4.3m |
| Total | $41.2m | |
Where the money comes from
What it will not doIt will not build a new marina. The wall comes first.
Back to the fourSay it on a doorstep
Fix the wall before the water fixes it for us.